Project Description

Technology & Engineering Development Facility (TEDF)
Newport News, VA

This $51M project includes the design of a new 70,000 SF building, the renovation of the 88,900 SF existing Test Lab Building 58, and a 30,000 SF addition to Building 58.  EwingCole began by performing a facility conditions assessment.  This assessment was followed by organized collaborative, interactive workshops to understand work flow.  The facility was designed to optimize and standardize the process flow of people, products, waste, supplies, and information through the facility.  Jefferson Lab achieved LEED Gold certification by using a ground source hybrid geothermal well field, dedicated outdoor air energy recovery units, solar heating of domestic hot water, and demand control ventilation.

 

“In all my years of reviewing National Lab Projects, I have never seen a project that so transformed a site and operations as the JLab TEDF project and congratulations to EwingCole for proposing the concept and JLab for accepting it.”
Ray Won
Engineering and Construction Manager, US Department of Energy
Jefferson Lab TED Building, Newsport News VA